What types of testing in 11Kv Ht switchgeat during testing?
Answer Posted / n.venkidusamy
I think that site tests.ie. Pre commissioning Tests of
following.
1. Insulation Resistance Test for breaker and protection
and other cables
2. Check for spirit level
3. Mechanical spring charge test
4. Mechanical ON/OFF test
5. Electrical spring charge test
6. Electrica ON/OFF Both Local and remote Test
7. Contact resistance Test
8. opening and Closing timings tests.
9. Protection trip Test
10. Check for operation of Closing coil at 80% and Trip
coil at 70% rated Control D.C.voltage
| Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
when we design electrical schemes of 11/.415kv distribution..wen and were should we show the relays??what is the function of it?for example..we place EFR Relay CT between transformer neutral link and transformer earth.Like this what are the other type of relays we should use?why?where?Explain please..Thank you
Briefing the effects of ASR and ACR of a double closed-loop speed regulating system.
What are the different types of LT Cables?
What is difference between slip rings and carbon burushes?
i want wipro vlsi placement pattern please send me
What do you understand by external characteristics of a d.c. Generator?
Operation of isolators.
Its possible to use 3core 2R of 240 sq.mm cable for 3phases & separely 50sq.mm 3core cable fully for Neutral for connection of PCC to MCC 3ph..4wire system?
how can i get the formula to find out the cable size if i know the load of main fuse protection.
in HT service 3ph 4 wire service Y-phase voltage shows zero . whether it is meter fault? or what be the reason ? if y-ph voltage zero ,can current is recorded? reasons for failure?
A car's starter motor draws a current of 100 A at 12,0 V when starting the engine. The mechanical power required to turn the engine is 960 W. At what rate is energy from the battery converted to non-mechanical forms of energy?
explain comutator action in detail.thanks
What is a surge supressor why its is used in synchronous generators
how to check ac servo motor
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?