Answer Posted / jagan
it is connected bet communication wavedrop and Ct.it is
used for met &pro..it is nothing but acapacitor arrangement
due to this large level of voltage will be stored and due
to small stepdown transfomer inside it is reduced to as
plant req.Ex;400kv/1.732/1.1kv/1.732.
Is This Answer Correct ? | 4 Yes | 6 No |
Post New Answer View All Answers
How to Preparation of online test
What happens if we run alternator on under frequency?
what is the calculation involved to design the heater to heat 10KL of water in temperature control unit?
In CTs tan delta point should be earthed , what is the reason behind it?
what is auto re-closer?
when ID fan will immediately stop through VFD what exactly cause and problem the ID fan
can any one tell in easy method for circulating current ??
What are the two basic types of transformers?
Please brief what is sinewave
What is Traction? 1KVA Alternator, How much urrent taken?
Is it possible to measure correct value of earth resistance & cable insulation ristance with out disconncting earth lead & both sides of cable ends? If not, any other method to measure ER & CIR with out disconneting from the system.
sir,in our plant we r using SATEC PM172E power reading meeters in HT panel side it is monitoring the MB data smart viewer(sever).but last one week we did not get readings inthe server only available in meeter.tell me how communicate meter and server. and also what steps we take for checking.
if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit
what is the minimum pay scale for electrical engineer (building construction)in kuwait? plz revert back with yrs of experience & pay scale respectively.
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?