Answer Posted / khan
scada is abrreviated as supervisary control and data aqasition where the all data which monitered by the user is collected and aquared.the data can means what ever the set point acc to the program is can changed from it.
although the whole operation is monited by mmi man machine inteface first it send to the control unit then to the fild unit .
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Why not come out analog output in ABB EL3020 when display show correct value
how many types of spped sensors n vibration sensors?their basic principle n connection?
What is instrumentation measurement?
IS there any effect of vortex in low pressure side of the transmiter after the orific in feed water line? if yes then what is the calculation?
Exothermic reaction./ endothermic reaction
how do u calibrate the vacuum transmitter if it shows more reading
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
I WANT SECURITY PAPER MILL, HOSHANGABAD TEST PAPER.KINDLY SEND TO MY MAIL ID
Can u tell me the principle of the tc,rtd,level switch,pressure switch ,transmitter(pr flow level temp.),vibration...plz
How can you add value to this Industry if offered the job?
There are many type of control cable like pair,core,tried, What are defination each one
Define the difference between a stable versus an unstable controlled system and some of the tools you might use to be able to detect when this is happening and assumptions used for control system application design that could contribute to instability
how to commission furnace ( water heater)
What is PDS and PDMS ?
Somebody tell me in what way i need to prepare for csio pgrpe(adv instrum eng)interview?what all the quest can i expect?