which software better design in structure design or Rcc
design(STAAD PRO,TEKLA STRUCTURE)

Answer Posted / tushar

anybody...pl.send me the detail about the esteem software &
soft.also,if u have ,pl. send it to my mail
id: tusshar_deo@yahoo.co.in

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

1662


At what point does a circle start losing area when being flattened?

636


what is anchorage length,lap length and (dont remember the last one)

1737


What you understand by building codes?

673


how do we design mix ratio?

1423






how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.

2145


Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.

1958


1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...

1630


How does a traffic light signal work ?

1833


it is a corrected question." make a list of engineering property(properties) of soil.

1596


Why steel rods are produced only in even dimensions?

2163


i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh

1837


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1466


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2236


Minimum and maximum size of the building components

1769