Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why Parallel operation of two Transformer are Required?

Answer Posted / reena

Main reason for parrallal operation of trasformer is to work without failure because we need power for 24 hours.

If failure occur or in cse of maitanace we can provide power to the consumer.

Also, one reason is that in parralal operation transformer share the total load.So, instead of one transformer if we have two it save total cost as well as the mainance cost coz we can manage with one if other has fualt so, we can atleat give power to the critical load.

Is This Answer Correct ?    7 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i need some project topics along with circuit diagram in the electrical adnd electronics engg and also give ome website regarding projects.my mail id is thenmozhi2k7@gmail.com .please help me.

2023


we have provided 30 nos. relay contacts in panel.I want to know how do we do the numbering for the relay contacts as per any applicable standards

2053


How much no load current of synchronous motor

2147


What are high pass filter and low pass filter? and What are the flowmeter ?

2040


1)we have 1000 cfm Blower,Dia-1Mtr,Velocity of air 94 m/s 2)We have Natural Air velocity 94m/s 3If i Put Wind Mill in natural air ,speed is 94m/s Then it will generate Assume 100kw 4)If i put same wind mill across the Blower,air speed is same 94m/s now the Question is Will it generate 100 kw?

2050


In hydel power plants, L.A's, S.C's are placed inside the control panel boards. what is the purpose? [already the total body was earthed to ground.]

2029


Earth is a conductor or load?then ammeter connect to 3- phase supply,it shows the measurents or not?

2144


please send me latest & previous years question papers for IOCL Technical level questions

1929


Explain how you decide what size of electrical wire do you need?

1188


Metal covered multiconductor cables shall employ a marker tape located within the cable running for its complete length in lieu of cable surface marking. Is it true or false?

2323


why the difference arise between HT reading & LT reading (submeters fixed in complexes, apartments etc)if the power factos exceed from 0.9 to 1 can the ht meter reads fast?

3032


which are the criterias needed to select the kind of neutral earthing(solid earthing,resistance earthing,etc.) at various voltage levels in electrical distribution?

2035


what is the minimum recommended leakage current of an earthed cable connected to the body or skid of an alternator

2102


which VFD is better ( LT or HT)

2116


can anybody send the rrb chennai &rrb bopal question papers of 2006&2007.My exam is on 12 oct 2008.Its urgent

2095