Answer Posted / jinchandramule
COOIS:Production order information system.
Gives you the Detailed information of the production order
like,
ORD NUMBER,MATERIAL,ORDER TYPE,PLANT,START DATE,ORDER QTY,
ORDER STATUS.
Which is used for the information purpose,in Shop Floor
control.
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
How to attach a drawing for a material to bom ? Is it possible ?
What is the recruitment cycle?
What is MRP Area or How can I excluede one storage location stock from MRP?
What is meant by payscale structure? How did you configure payscale structure?
Explain why their is need of production version ?
Tell some standard order types and what configure done for current project
What are all the ‘technical types of bom’?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
What happens to plan after it has been converted into production order?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
You want to integrate pp with fico. What steps would you take?
What is the use of sap material view and list out other parameters where sap material view is applicable?
What is mrp list and what is the use of it?
What is the internal recruitment?
Explain what is the meaning of exploding a bom?