Answer Posted / jinchandramule
planning cycle:A cycle in which the planning run is
performed for a material.
If a vendor delivers a material on a particular week day,
it is useful to plan this material according to the same
cycle, while allowing for the delivery time.
Total planning run:
strategy group:
Procurement Type:
Indicator that defines how the material is procured. The
following procurements types are possible:
The material is produced in-house.
The material is procured externally.
The material can be both produced in-house and procured
externally
Scheduling Margin Key for Floats:
Key that the system uses to determine the floats required
for scheduling an order. You define the following floats
with the scheduling margin key:
opening period
float after production (only in the case of in-house
production)
float before production (only in the case of in-house
production)
release period (only in the case of production order
management)
Floats are maintained in workdays.
Consumption mode:
The consumption mode controls the direction on the time
axis in which the system consumes requirements.
Use
In backward consumption, sales orders, dependent
requirements or material reservations consume planned
independent requirements that lie before the requirements
date.
In forward consumption, sales orders, dependent
requirements, or material reservations consume planned
independent requirements that lie after the requirements
date.
Consumption mode
The consumption mode controls the direction on the time
axis in which the system consumes requirements.
Use
In backward consumption, sales orders, dependent
requirements or material reservations consume planned
independent requirements that lie before the requirements
date.
In forward consumption, sales orders, dependent
requirements, or material reservations consume planned
independent requirements that lie after the requirements
date.
Availability Check:
This field has two uses:
1. Specifies whether and how the system checks availability
and generates requirements for materials planning.
2. In Flexible Planning, defines - together with the
checking rule - the different MRP elements that make up
this key figure. The sum of these elements gives the key
figure.
THESE ARE THE MAIN CONTROLS IN MRP
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
In cost controlling information system mention the fields that are listed in the list screen of the report?
What is plm (product lifecycle management) in sap pp?
What is the SPRO Path for requirement class and req. type?
Are there any reports in sap to list of material requirement from ltp ?
Mention how mrp (material requirement planning) types are classified?
What is the internal recruitment?
What is mrp group and what is the use of it?
What is scope of planning?
How do you get the system to update this value from the routing?
Explain Flexible Planning procedure or How many levels of Flexible planning.
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What general data appears on basic data screen?
What is Phantom Assembly?
What are the MRP master data?
In project the customization is comes under which phase?