Answer Posted / jinchandramule
planning cycle:A cycle in which the planning run is
performed for a material.
If a vendor delivers a material on a particular week day,
it is useful to plan this material according to the same
cycle, while allowing for the delivery time.
Total planning run:
strategy group:
Procurement Type:
Indicator that defines how the material is procured. The
following procurements types are possible:
The material is produced in-house.
The material is procured externally.
The material can be both produced in-house and procured
externally
Scheduling Margin Key for Floats:
Key that the system uses to determine the floats required
for scheduling an order. You define the following floats
with the scheduling margin key:
opening period
float after production (only in the case of in-house
production)
float before production (only in the case of in-house
production)
release period (only in the case of production order
management)
Floats are maintained in workdays.
Consumption mode:
The consumption mode controls the direction on the time
axis in which the system consumes requirements.
Use
In backward consumption, sales orders, dependent
requirements or material reservations consume planned
independent requirements that lie before the requirements
date.
In forward consumption, sales orders, dependent
requirements, or material reservations consume planned
independent requirements that lie after the requirements
date.
Consumption mode
The consumption mode controls the direction on the time
axis in which the system consumes requirements.
Use
In backward consumption, sales orders, dependent
requirements or material reservations consume planned
independent requirements that lie before the requirements
date.
In forward consumption, sales orders, dependent
requirements, or material reservations consume planned
independent requirements that lie after the requirements
date.
Availability Check:
This field has two uses:
1. Specifies whether and how the system checks availability
and generates requirements for materials planning.
2. In Flexible Planning, defines - together with the
checking rule - the different MRP elements that make up
this key figure. The sum of these elements gives the key
figure.
THESE ARE THE MAIN CONTROLS IN MRP
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Explain the mrp list and their uses.
How to attach a drawing for a material to bom ? Is it possible ?
Explain Kanban.
What is 'mps' (master production scheduling)?
What is the need of mrp list if the stock requirement list is already given?
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
What is end user training
What is the use of t-code cs20 in bom?
Difference between Item categories or what is variable size item or non stock item.
Mention what are the production process in sap?
What is the difference between the fixing type 1, 2, 3, 4?
What is MRP group?
What are the basic dates?
How the processing time is calculated in a wc when both labor, machine categories exist?
What is Phantom Assembly?