Answer Posted / mursri
37
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
USA + USSR = PEACE ; P + E + A + C + E = ?
in a mixture, R is 2 parts, S is 1 part. in order to make S to 25% of the mixture, howmuch R is to be added
In an examination 30% of the students failed in Maths, 40% failed in Science and 25% failed in both the subjects. If 220 passed in both the subjects. Find the number of students appeared in the examination ?
If A/B = 3/5,then 15A = ?
A worker pay Rs20 a day ,he works 1,1/3,2/3,1/8,3/4 in a week.What is the total amount paid to the worker.
4 couples have a party.Depending on the set of statements,find who insulted whom and who is the host of the party.
Sky Heaven is a 16 stored building with 12000 sq. feet on each floor. Zintac International rents 7 floors and Zobia International rents 4 floors. What is the number of sq. feet of unrented floor space?
modulo(373,7)+round(5.8)+truncat(7.2)-round(3.4) = ? i exactly don't remember the truncate function.but the function was where we skip the '.' part.
sadrine's avg on four tests is 80 which of the following cannot be the number of tests on which she earned exactly 80 points
Ram, Shyam and Gumnaam are friends.Ram is a widower and lives alone and his sister takes care of him. Shyam is a bachelor and his niece cooks his food and looks after his house. Gumnaam is married to Gita and lives in large house in the same town. Gita gives the idea that all of them could stay together in the house and share monthly expenses equally. During their first month of living together, each person contributed Rs.25. At the end of the month, it was found that Rs 92 was the expense so the remaining amount was distributed equally among everyone. The distribution was such that everyone received a whole number of Rupees. How much did each person receive?
In a company 30% are supervisors and 40% employees are male if 60% of supervisors are male. What is the probability that a randomly chosen employee is a male or female?
If 20 men take 15 days to to complete a job, in how many days can 25 men finish that work?
f(X)= 2X-1 + f(X-1) if X is not equal to zeroandiff(X=0)=0, If f(f(X))=81 then the value of X=?
There was a ques on work something like 2 typists type 2 papers in 4 hrs then in how much time will 5 typists take or something like that.
Asian paints takes a contracts to paint 3 houses. Mr. White can paint a house in 6 days while Mr.Blue would take 8 days and Mr.Red 12 days. After 8 days Mr.White goes on a holiday and Mr. Blue begins to work for a period of 6 days. How many days will it take Mr.Red to complete the work?