IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE
METHOD IS BEST?
I THINK WORKING STRESS METHOD IS BEST?
EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST
IS;1913SQ.MM
SAME TIME WORKING STRESS METHOD IS ;2213.
SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE
THEN LIMIT STATE METHOD?
MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
Answer Posted / santhosh kumar
dear
britto/ram/saravanan
pls to sent your mail id to santhoshselvamani@gmail.com
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
what is polity
how can we construct building without foundation providing only grade beam at ground level
what is called the inverd level of mabhole chamber?
What are the skills required to become an architect?
What is the coeffiencent Friction Angle between Steel and Ashphalt?
What goals do you have in your career?
why +1 to be followed for calculating the no of bars in BBS. Please explain
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
What are the strongest shapes in building?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
Why the statue of liberty is made of copper?
how to calculate the weight of concrete
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
what is the weight of 10mm,20mm,40mm aggregate
rate analysis for cement pointing 1:4 , for 100 sq m