Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why we do design mix of concrete when there is nominal
method using the IS-Code available ?

Answer Posted / nagori salim

The basic difference betn the two is;

Nominal - Volumetric Batching.

Design - Weight Batching.

In design mix degree of quality & control on quantity is
highly maintained.

Is This Answer Correct ?    12 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2499


Explain what is alternate bid?

1328


why we use aggregate,sand with cement in concrete?

10048


significance of specific surface area of particles?

2179


PL.tell me about civil engineering questions with answer

2597


how water proof chemicals act in concrete to avoid leek?

2293


Formula for calculating the volume of bulb in underreamed pile

5067


length where bent up is made in slab of bridge from one end

1984


define the strength

2245


What are moment of inertia and its importance in civil engineering?

1364


why development length = 50D . why not 100D

2125


what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??

3148


Minimum concrete cover in slabs, columns, beams, foundation and other st?

1328


how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')

2707


if dia of slab beam bar is38mm what its clear cover any method of provide clear cover

2102