Why we do design mix of concrete when there is nominal
method using the IS-Code available ?
Answer Posted / nagori salim
The basic difference betn the two is;
Nominal - Volumetric Batching.
Design - Weight Batching.
In design mix degree of quality & control on quantity is
highly maintained.
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
Stringer How many cm goes to landind
What is the strength of cement?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
What is the cemnent ratio
what is the ingredient value of 40mm and 20mm aggregates?
Rate analysis of Vitrified tile in cement mortor 1:3
Why do you want to work here
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
How do we calculate absolute pressure?
what is the painting co efficient of slope roof tiles?
What is the likely strength of a 1:2:4 concrete mix?
Define What happens to Load at yielding ?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs