Why we do design mix of concrete when there is nominal
method using the IS-Code available ?
Answer Posted / nagori salim
The basic difference betn the two is;
Nominal - Volumetric Batching.
Design - Weight Batching.
In design mix degree of quality & control on quantity is
highly maintained.
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
What is the per cu. mt. price of ready mix in Gujarat region.?
Types of column foundation and how to calculate its steel quantity.
what is civil engineer greatest strength and weakness?
what is pile and deam foundation
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
What are the techniques to measure road difference?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
Define What is the difference between routing maintenance and major maintenance in school facilities?
What is an ice dam sock?
mix design procedure for 1:6 cement mortar
what is hydrostatic paradox?