Answer Posted / kamal jeet rai
Lap Length is 0.45 times dia of bar
i,e : Required lap length for 25mm dia of bar =.45x25
=1.125m
| Is This Answer Correct ? | 7 Yes | 45 No |
Post New Answer View All Answers
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
How to calculate quanty of steel in four leg stirrups?
how to calculate total cost for slab 35'×8'
very simple or less time consuming formula for reinforcement calculation by moment
what is meant by residual strain?
what is the design procedure for building
What will you do if you encounter problems like accidents?
How to marking the building
what is idealized curve for concrere and steel
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
The foundations are placed below ground level, to increase?
How cracks in concrete can be avoided?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?