Based on CPI/CGPA they shortlist the candidates & than
directly start Interview so there is no Written Exam or GD
Only PI.Interview held @ MNNIT , ALLAHABAD On-Campus on
6th,Aug, 2007 & the Questions asked to me by Interview Board
( 4 People) are from HR/SummerTraining/BTP/Subject-core,
POWER SYSTEM & MACHINE. time duration of I/V is about 15-20
Minutes.
HR-
Q.1 Name,hobbies & About family background ?
Q2.What u know abt NTPC ??
Q3.Why u want to choose NTPC as ur Carrier's starting i.e
power sector not any other Oragnisation or sector ??
Techincal Questions-
Q1.What is the reason for transformer Noise ??
Q2.Which material is used for making Transformer oil & How u
measure its dielectric strength & Name the test ?
Q.3 Which Machine u will prefer 2 use if flammble gases are
coming out at a place & why ??
Q4.What is relation b/w Transmission Lines & Communication
Lines ?
Q5.What is the maximum capacity Synchronus Machine & total
powerGeneration in our country ?
Q.6 In india Power generation is at 50Hz while in America
its 60 hz ,why so ?? Advantage or disadvantage ??
Q.7 Maximum Generation Voltage in india ?
Q8. What is the Voltage regulation & why its required n how
much is permissible ? & causes of voltage variation ??
Q.9 Why electric shock is feel ?? n in a Electric Train why
we didnt feel that ?
Q.10 Have u seen/ experience of any power plant/ industry
related to the power sector ?
so these are the questions which not too diffcult i
think was asked to me.
Answer Posted / shivangi
for Q no.4
The technical field relates generally to a transmission
device for transmitting a signal through a transmission line
between circuit blocks having different power supply systems
and to a semiconductor integrated circuit for communications
suitable designed to communicate by using a differential
voltage signal between communication lines.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
How to select a transformer group to connect a 0,433 KV generation with 33 KV grid in bi directional flow of current
TO CALCULATE THE RESISTANCE OF GRR OF HT MOTOR 400KW WHEREAS STATOR VOLTAGE 6.6KV AND ROTOR VOLTAGE 705V AND ROTOR CURRENT IS 346A.
What are the types of control system?
what are the standard IR values should be of R-E, Y-E, B-E, R-Y, Y-B, B-R of VCB in closed condition and in open condition for 500KVA & 1000KVA transformers. and what is the acceptable range when tested by 5000V megger.
What are the necessary components of the feedback control system?
what are carbondioxide and dcp used in fire extinguishers
What the main causes of transient interruptions on Over-Head Distribution Lines?
What the formula for calculating no.of earthings & size of earth strip for 100mX90m shop.
I have a CT meter with ratio 60/5. The meter reading of previous month was 3290.49 and that of current month was 3797.26. How many chargeable units as per normal meter should be my reading.
please send me privious exam's queation papers of section engineer(electrical).
details of oil cell size of Breakdown voltage test of tranformer oil details as per Standardswith mushroom electrodes?
What is the meaning of C1, C61, C91 cable
How does zener phenomenon differ from avalanche breakdown?
wat system call?
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?