what is the minimum dielectric stregth of transformer oil.
Answer Posted / sreenu
40KV/2.5 mm gap for 1 minure.
| Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
What aturn on methods of scr?
IN electrical field, WHAT ALL THINGS THE CUSTOMER WILL ASK WHILE ORDERING FOR LT PANEL (ALL TYPES OF LOW TENSION PANEL)
what can be the causes of capacitor start motor having a higher current that its actual
Hello sir, pls send me hpcl technical test papers .i am. Appearing for the exam.
Can i use the B-curve MCB instead of C-curve MCB
If a surge divertor is required to be protected by 32 amp C Curve Circuit breaker does this limit the amount of protection from surges that you will acheive
can indirect loading be called as phantom loading?
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
in cvt,there are two windings,1a,1n and 2a,2n.in my one project i use only one winding i.e.1a,1n. the other winding is not in use, so i connect it in open delta and want to close it by ibsertibg thermal resistor. the output of cvt is 132kv/115/sqrt3. plesae tell me exact value of resistor, so i may close it to avoid the resonance phenomenin. send me answer on this email adress please. aetcon-po@aetcon.com
Which type of DG need Netral Earthing?
How to calculate ant test the burden of Current transformer
In convertor can we use rectifier thyristor in place of invertor thyristor with explain.
What are the functions of temperature scanner in power transformer?
plz send me the syllabus or any sample paper for engineer trainee recruitment if any,on ravinder911@yahoo.com
Can anyone please give me the parameters , formula needed to calculate the circuit breakers for building services.Thanks