how to check the earth resistance value& what is the
minimum earth resistance for good earthing sysytem.
Answer Posted / bhavini
earth tester use for measuring resistance of earth pit
should be less than 1 ohm.
| Is This Answer Correct ? | 105 Yes | 26 No |
Post New Answer View All Answers
What Should be the value of Vector Surge angle at Tripping and how to calculate it?
Fantio of tranformer
transformer spections :: input voltage 0-110-230v; output volage 0-10-12-14v; amp=3A using CRNO CORE, capcaity=50VA primary turns = ? ; secondry turns =?
1.4 What is meant by CT knee point voltage and how would you determine it
HELLO SIR, IAM PREPARING HPCL EXAMS. SO PLS SEND MATERIAL OF HPCL ELECTRICAL ENG..TO VIJAY_8888@YMAIL.COM
for a 500 KVA connected load, I calculated 30% of capactor for power correction. Even after using 225 KVR capactor PF is not improving. What could be reason for low Phase correction factor?
what is relay what is protection & contact multiplying relays where it is used function in brief
what are the breakdown voltage rating of mini- curcuit'transfarmer!
we have provided 30 nos. relay contacts in panel.I want to know how do we do the numbering for the relay contacts as per any applicable standards
Why do we require transformer with less specific weight if supply frequency is increased?
what do you mean by every IC 74 first digit.why are you using this no.why not using another no.
what is the criterion for selecting vector group of Transformers ? i mean how to decide vector group of Generator transformer, substation trasformer and transformer at consumer end
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
What are the disadvantages of thermal power plant?
what is the minimum pay scale for electrical engineer (building construction)in kuwait? plz revert back with yrs of experience & pay scale respectively.