What are causes of cracks in outside plaster of a building
and how we prevent it during constructions?
Answer Posted / sjtbehera
There is very little that you can do, to prevent a plaster
ceiling from cracking. If it's going to crack, there is
nothing you can do to avoid this. However, these cracks can
easily be repaired using
Fiberglas drywall tape and finishing it with drywall joint
compound.
I have probably made this repair sound easier than it is,
but there is another alternative. You could fill the crack
with a good paintable caulking. Make sure that the caulking
you use is paintable, some silicone-based caulking aren't
paintable. If the caulking can be painted over, it will
save paintable on the tube of caulking.
| Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
Define What is made from large rocks, which protects the base of cliffs?
What is the zero value in quantity surveying
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
why development length = 50D . why not 100D
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
WHAT DLC DESIGN IN CONSTRUCTION
What is the meaning of soil reinforcement?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
How do we test on design and style in a software?
rimmer in pile foundation
What is the difference between Grade I, II and III of GSB?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
What is Gsb tollens ?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700