Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the function of breather in a transformer

Answer Posted / dipak

Breather provides economic and efficient means of
controlling the level of moisture entering electrical
equipment during the change in volume of the cooling medium
and/or airspace caused by temperature gradients.

Is This Answer Correct ?    5 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are motor generator sets and explain the different ways the motor generator set can be used ?

1233


Why a Permanent Magnet Generator has higher frequency as compared to frequency of main alternator?

2057


What is the function of under voltage release ?

1495


When will you multiply and devide with derating factors to the actual value while sizing the cable?

1986


what is strip power factor?

2226


we have provided 30 nos. relay contacts in panel.I want to know how do we do the numbering for the relay contacts as per any applicable standards

2053


What are the causes for the failures of sandwich type (Al) busducts?

1915


A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.

1160


What will be the voltage regulation of a full load and 0.80 power factor lagging load transformer when a two winding single phase transformer has a voltage regulation of 4.5% at full load and unity power factor?

1284


Explain mechanical rotational system?

1171


Why in metering Ct for ammeters ct secondary side is grounded for each Ct but not in case of CBCT (Core balance current transformer)..kindly some1 highlights the reason..is it because net flux is zero?

1484


in non technical way how can u define POWER FACTOR??

1875


Whats the minimum value for I.R. that can be allowed for HT & LT alternators for operation?

4151


Is it possible to download the Siemens Selection Chart(TYPE 2 coordination) for 1) fuseless selection 2)Fuse selection

8296


plese send me the oces/dgfs sylabus and previous year question pattern of electrical engg.?