How the main bus bar rating of 400kV switchyard with one
and half breaker scheme is calculated.
Answer Posted / jayasudha
Consider installed capacity + 10 % margin
| Is This Answer Correct ? | 5 Yes | 6 No |
Post New Answer View All Answers
at meter room 50 hrc switch installed,but there are not get earthing proper,so what happen?and 11kv transformer out put going in to hrc main 400a three nog each? so earthing is require for all switch? (some customer made earthing at there home.)
what is the effect of earth on capacitance in 3-phase and 1- phase transmission line?
What is the temperature PROFILE OF A FLUID W. R. T. Distance from a sphere to which it is IN CONTACT which is at constant temp.?
hello friends..... any one have papers or any study materials?sail ,hpcl...?
In single phase ac ups supply when current is measured with tong tester neutral current is found more than phase current.What is the reason?
what is alluminium arm in ab conductors
wHAT IS CAPACITANCE LATCHING? hOW TO CALCULATE CAPACITANCE LATCHING? hOW TO SOLVE THE PROBLEM IF CAPACITANCE LATCHING APPLIED?
ANY ONE TELL ME ABOUT generator synchronization panel panel to synchronise 3 gen of 250kva both automatic and manual. 2 gen output vol 415 3ph, 1 gen output vol 400 3ph SEND THE DETAILS DIAGRAM ON THIS EMAIL ADDRESS ayazleo@hotmail.com as soon as possilble best ragrds electrical engineer ayaz mahmood SAUDI TECH
why we use ac supply as 415 volts instead of 415 v why we cant apply 230 v for dc
what are types of encoder
Why is the frequency not changed during transformation of electrical energy in a transformer?
what will be happen if earth point is being used for as a neutral point for raw power , and same will be used for ups earthing
The slip during plugging operation is given by= A 1-s B 2+s C 1+s D 2-s
describe the constructional features of an auto transformer and its principle operation
what is the difference between ups & inverter