How the main bus bar rating of 400kV switchyard with one
and half breaker scheme is calculated.

Answer Posted / jayasudha

Consider installed capacity + 10 % margin

Is This Answer Correct ?    5 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

help me with the question that might be ask on the interview for technical position

1807


Why do we perform an open-circuit test and short-circuit test on the transformer?

623


What will be the impact on motor performance if a LT motor is rewound with changed motor winding data as given below:- Original winding data: total 04 wires = 02 wires of 17 SWG + 02 wires of 16.5 SWG. Changed Winding data: total 03 wires of 15.5 SWG wire size Motor rating: 160KW, 740RPM, 415V, ID FAN application. Normal Running Current = 95% of FL Current.

1572


working principle of oil startar

1445


How to calculate cable size by using load.?? Any formula...

898






What are the difference between CT/PT operated Meter and RRAMR Meter for HT/LT application?

2009


new 90kw motor installed so how I purchased cable ,fuse,etc please give me technic for cable selected why always capacitor delta connection

1354


i am trying to PSUs/govermeant jobs since last 2 years but still i m not success, plz help me.

1449


Explain about how is it working Earth fault'relay and wahts the resistance value of earth bed

1022


what is mean by NPS (Negative phase sequence)fault? what is the difference between EFR & OCR faults?

1771


In which working principal temperature transmitter work.explain in detailed.

1823


concept of busbar and load dispatching..?

1920


What are the advantages of hydropower?

651


plz send me Bhel, Mahagenco, sbi previous exam paper for electrical engineer on my email-id kambali_smita@yahoo.co.in

1926


what's the exact magnitude of current, flows through Neutral?

1538