Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how can we decide where we have to DYn11 or other vector
group transformer

Answer Posted / gunasekaran

normally Dyn11 vector group using at distribution
system.because GT are YNd1 for neutralizing the load angle
between 11 and 1. we use Dyn1 at distribution system we r
using GT are YNd11. in some industries 6 pulse electric
drives are using due to this 5thharmonics will generate if
we use Dyn1 it will be suppress the 5th harmonics.

Is This Answer Correct ?    10 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what work will do diffrential realay DG set

2896


Why the earth to phase voltage is high 250 compare to other two phases

1524


which type of questions asking for solar companies?

1600


what is control supply rating of a machine

1989


Define the three phase formula fuse.

1870


what will be project cost for 100 kv transformer connection under oyt scheme.

2935


I FINISHED MY B.TECH IN EEE . I AM IN NEED OF A GOOD TRAINING INSTITUTE TO DO COURSES .. CAN ANYONE SUGGEST GOOD CENTRES IN TAMILNADU ,BANGALORE ,OTHER AREAS???????

2015


If rotor works in clock wise what happens

1910


In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.

2124


RATING OF LIGHTENING ARRESTER FOR 11 KV LINE IS 9 KV is ok ,but haw to calculate the KA rating?

2089


how to calculate the capacitor to maintain power factor?

2169


please give me all the Alarm .Trip ,Safety Relays & Conditions of Chiller mail me on ashokbabunhce@gmail.com

1829


What is the complete procedure of erection of electrical panel in industry

1872


In PFI plant one stage capacitor connection is directly connected(with out megnetic contact controll). but why?

2296


I COMPLITED MY B.TECH AND 10TH CLASS WITH 70%MARKS BUT 12TH CLASS 55%MARKS..CAN I GET INDIAN RAILWAY RECUREMENT EXAMINATION?

2186