we are implementing Negative and Positive time evolution for
our client..and they need the absence quota to be
automatically updated for all the employees at once. I did
this for Negative Time management with out payroll
integration by using TQTA.
but how to do it(absence quotas should be automatically
updated for all the employees ) by running positive and
negative Time Evolution with TMSTA 1 and 9 .
Answer Posted / chennakesava reddy
We can updated the absence quotas for all employees in
negative time evaluation by using TM04 schema with TMSTA 9
and positive time evaluation absencees by using schema TM01
with TMSTA 1 0r 2.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How are relationships in om specified?
What is the difference between general structure and matrix structure?
What is the role of enterprise structure and personnel structure in time management and payroll?
Where can we see the integrations is switch on, is there a table?
What are dynamic actions? Give a few examples. What are the it's you used in them.
What is the use of payroll control record?
Which three different administrators are stored for an employee?
What is Fast Entry For Actions?
Explain the characteristics of wage type?
Which activities are performed when you run a payroll in the simulation mode?
What is the feature igmod used for?
How many plan versions can be integrated with other sap modules?
Which infotype maintain relationships between objects?
What is personnel area?
what is beta report