Why we Specify Transformer rating 433 V Instead of 415V
?
Answer Posted / n manivannan
Appliances rated voltage is 415V. If Trasformer is specied
at 415V, it will further drop down at receving end and
appliances may not work
To compensate Voltage drop at receiving end
Is This Answer Correct ? | 42 Yes | 12 No |
Post New Answer View All Answers
HOW THE OLTC TRANSFORMER SAVE ENERGY IN COMPARISON TO OFF LINE TRANSFORMER AND IS IT ECONOMICAL TO REPLACE THE OFF LINE TRANSFORMER TO OLTC TRANSFORMER
what is the reqirred voltage in HT motor to get full RPM on no load test?
is it necessary to earth the rmu before cutting off the transformer winding?if yes why?
What do you mean by turns ratio of instrument transformer?
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
How can two 3 phase transformers of same KVA and Voltage be connected in parallel?
What is the Minimum winding resistance of motors ( small & big)? referance range
what is the star delta connetion and how can do it a three phase motor with control witing with picture
i have some screw comprressor with 630kw power,i have established them with simple star to delta circuit,by the way there is so much inertia when the screw comprressors start, can you offer me contactors power with 400vac or any cataluge to choose the contactors
Why use the vcb at high transmission system ? Why can’t use acb?
why the rotor current becomes in steady state during high slip region? please verify with equations.
Explain what is clipper and clamper circuits?
what is the standard duration after failure EB power
What facility we get after CT secondary earthing and how?
Generation of voltage for each phase are same of a turbogenerator.Although the short circuit current flow when two phase of turbogenerator are shorted(where current can't flow without potential difference),why?