Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

"Why you consider yourself suitable for the post"

Answer Posted / nadim

bcoz i think that my knowledge is comparitively suitble
with ur requiements and also i wanted to work in such a
odition where my knowledge and experience makes the best
in me so i can aply tis to make a project which would be
appreciated

Is This Answer Correct ?    18 Yes 33 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between routing maintenance and major maintenance in school facilities?

1170


how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .

2785


to minimize budget cost of building , what can i do

2346


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2327


Why are pull-out tests performed for soil nails?

1230


Explain the different types of roofing systems?

1307


How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?

2318


For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?

2265


How much sand and cement requirement for 1 SQM 125mm thickness Brickwork

4554


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

1450


if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete

2152


What is rate for brick masonry work of 1.0 m3 in cm 1:6?

1225


A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.

2227


How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)

1907


Which is the best book for building construction?

1146