what r the key components in a test plan document?
Answer Posted / chandru
In addition to the above components the factors like:
1.Unforeseen problems that means we have to guess certain
problems that may arise in client's place.
2.Scheduling and allocation the testing resources
3. HW/SW requirement.
4.In additon to Risks, failures to be identified like HDD
crash, DB recovery, back ups needed in terms of HW/SW and
resources to be planned in advance!
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What do you understand by ‘test effectiveness’ and ‘test efficiency’?
Performance Evaluation means..?
What is the difference between Test cases document and test cases design document?
kindly guide me about inspection process with the requried roles in detail?
Differentiate ad-hoc testing and exploratory testing?
When we should continue testing?
What are the tools used by a tester while testing?
How are the quality assurance activities planned ?
How to perform SQL inject test for a login page using OWASP ZAP proxy security testing tool
How is monkey testing different from adhoc testing?
Why are You so sure that You are qualified enough to this SQA Tester Job?
how to identify metrics, integrity level, identify risks and identify security issues in ieee 829 standard explain with examples??
What is a cookie testing?
What should Development require of QA?
What tools are available to support testing during development of application?