Do you know the overhauling of a motor?
Answer Posted / riyaz.a
OVER HAULING OF MOTOR MEANS OF REMOVED THE ALL PARTS AND
CLEANED AND MUST CHANGE THE BEARINGS THEN CHECK ALL PARTS
CLEANED WELL WITH OUT DAMAGE THEN REASSEMBLE IT APPLLY
GREASE TO MOTOR FINALLY CHECK MOTOR SOLO CURRENT IT TAKES
ONLY 30%OF ITS FULL LOAD CURRENT .
| Is This Answer Correct ? | 14 Yes | 4 No |
Post New Answer View All Answers
What is cathode ray oscilloscope (cro)?
PLZ EXPLAIN CORONA,SKIN,BIRD PALE,SPAN,SAG Effects of power cable.
On 400 amp factory load how kvarh capacitors provide
some time we open engine breaker 8.0 MW load but plant not trip. and another time engine open 4.0 MW load engine trip why? individually engine breaker open & individually emergency stop why difference?
we use capister for power factor. when we use capaciter in dg circuit than defect dg. can we use capaciter bank for dg circuit
i have a 1500kVA transformer what is the kWH meter i need to use?
why ht cable end termination don't have a gland?
When calculation of fault current and fault Kva is to be done,why always we use per unit value and why we consider the base kva?
tell me about eletrical contractor
Minimum IR value of 1.1 kv grade 3.5c (300, 240,185,150,120,95,70,50,35,25) sqmm Aluminium XLPE cable and 4c (16, 10,6 & 4) sqmm cu arm cable between RY,YB,BR,RN,YN,BN,RE,YE,BE & NE.
I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.
HOE WE CAN IMPROOVE BY USE OF CAPACITOR
what is the calculation formula for motor starting torque,running torque, running torque.
How to use earthing on shipments.
Briefly describe your ideal job?