Do you know the overhauling of a motor?
Answer Posted / riyaz.a
OVER HAULING OF MOTOR MEANS OF REMOVED THE ALL PARTS AND
CLEANED AND MUST CHANGE THE BEARINGS THEN CHECK ALL PARTS
CLEANED WELL WITH OUT DAMAGE THEN REASSEMBLE IT APPLLY
GREASE TO MOTOR FINALLY CHECK MOTOR SOLO CURRENT IT TAKES
ONLY 30%OF ITS FULL LOAD CURRENT .
| Is This Answer Correct ? | 14 Yes | 4 No |
Post New Answer View All Answers
in ACB breaker requireding 3200Amps. buscoupler getting OFF mode and again it reset and getting normal position give me a required answer?
Installation resistance for whole installation of 16 kva & 25 KVA DTRA a) Between each conductor b) between conductor to earth c) installation resistance for each apparatus, each conductor to earth d) earth resistance for the system of earthing
Hi I'm doing my MBA(3rd semester).I applied for the post of ET conducted by BHEL the last year.I cleared the written and lost in personal interview.Again I wrote the exam this time and cleared the written n yet to take the personal interview.Shall I disclose in the interview about my studies.What shall i say if they ask about my change from studies to job
I want the details about BHEL company examination.Can anyone able to help me please.
why +24 v and -48 v give to BTS? If -48v protect from surge then why we not use -24 v?
If ROC does not lies inside unit circle,then ? a) Fourier transform converges b) Z transform converges c) Hatly transform converges d) Colpit Transform converges.
what is the transformer turn ratio formula and give some examples?
What are the disadvantages of hydropower?
What facility we get after CT secondary earthing and how?
What does the kvar means?
hi can anyone pls tell me the eee interview core questions asked in l&t
why and how current drawn by battery charger depends upon the altitude where it is located?
at work we have a 3 phase motor but on testing one phase isnt getting a reading. it runs 24 hours a day all week. stops and starts well no noise or heating. the phase isnt down to earth.is it just a bad meter reading or not? phases one and three came up with a resistance reading of 0.4 but phase 2 couldnt get anything shows up as open circuit.
How do i perform grounding of star point of Genset (400V) for making connection with step up transformer of DELTA-DELTA (400V to 20KV) ? while Genset itself has its own neutral and grounding bus bar inside genset breaker box whereas we have another neutral and grounding busbar in synchronizing panel next to genset at maximum distance of 6meter, would someone pls advice if we can only perform neutral grounding in synchronizing panel or should we ground neutral on both places inside genset breaker box and synchronizing panel.
why we take movement of rotor always in counter-clockwise direction in 3-phase induction motors?