How to schedule counter base maintenance plant for DG in
power plant that need 800hr per month maintthis
steps i followed.
1)i have created meas pt with counter (IK01) created meas
document IK11 then schedule thru IP10.
but not getting due order list in ip24.
can any one help me by telling exact cycle.
thanks in adv.
Answer Posted / patil kiran
Ist if you want u can make strategy plan with counter base
for that make strategy thro IP11 ( 200,400,600,800 Hrly
operation PM check list & attach Taskl list to PM plan)
iindly two type of schedulling one is manual other is
automatic ,. make the program standard RISHTRA20 THROUGH
IP10 dead line monitoring with varient for particular plan
on periodic basis i.e. every day night or weekly basis.
that sit you will get PM order through automatic
schedulling.
if anybody wnt to comment on above plz mail me.
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What do the cs03 tcodes in sap- pm mean?
What do you understand by horizontal and hierarchical data transfer?
What are the different reports under plant maintenance in information system?
What is an ongoing maintenance?
Do we need to run this transaction code ip30 for all the maintenance plans which are scheduled on regularly daily basis or weekly basis so that if any scheduled object exists then it will get converted into the service order ?
When to represent an object as equipment or as functional location?
What is purpose of technical id field in equipment master data?
How overheades are calculated and from where the formula is picked?
For an equipment master record what fields need to be filled in?
Explain the key steps performed in refurbishment process?
What configuration required in mm module for refurbishment process?
What is corrective maintenance?
How a general task list is different from equipment and functional location?
Is it possible to change the equipment category once created?
What is purpose of sub-order? What is the t code to create a sub-order?