what is periode of deshuttering for different area of slab
Answer Posted / santhosh kumar
basically deshuttering of slab is in depend up on the mix
propotion of the concrete.and achived strength more than
75%.
like m15 is needed for deshuttering period is 21 days
we are using m20,for slabs need 14 days is enough.
in beams we are using m20 and above 10 ~14 days are
applicable in practcial.
for using post tension in the slab we are using m35
concrete in slabs it is deshutttered 7 ~ 8 days.(when the
portion is after stressed)
to calculate the concrete strength in lab take 3 cube of
concrete and tested in lab 3 cube average strength is
needed 75%.
| Is This Answer Correct ? | 59 Yes | 12 No |
Post New Answer View All Answers
Forces in a Shear Wall are in plane or out of plane ?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
How is the strength of cement measured?
what is the ingredient value of 40mm and 20mm aggregates?
What is thumb rule in quantity and cost estimation of a residential building?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
What is the difference between Fe 500, Fe 500 D and Fe 515.
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
How many litres of water used for curing of 1000sqft of slav
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
what are the types of design? which type of method is used at what type of design & why?
What is the standard volume of pharma in cub ft
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
how we can find sieve #4 is 4.75mm?
How do we determine the specific gravity of a cement?