what is periode of deshuttering for different area of slab

Answer Posted / santhosh kumar

basically deshuttering of slab is in depend up on the mix
propotion of the concrete.and achived strength more than
75%.
like m15 is needed for deshuttering period is 21 days
we are using m20,for slabs need 14 days is enough.
in beams we are using m20 and above 10 ~14 days are
applicable in practcial.

for using post tension in the slab we are using m35
concrete in slabs it is deshutttered 7 ~ 8 days.(when the
portion is after stressed)
to calculate the concrete strength in lab take 3 cube of
concrete and tested in lab 3 cube average strength is
needed 75%.

Is This Answer Correct ?    59 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is a well

1506


How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.

2162


Define What is the difference between routing maintenance and major maintenance in school facilities?

741


How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?

6357


What is Joule Brayton Cycle?

766






sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.

1490


How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....

1508


how much need sand and cement for 1 cft roof construction?

3967


What is the purpose of the gap in the road on this bridge?

695


List out some of the common problems that architect have to tackle it?

634


what is the type of earthing

1770


how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?

5728


how much area can be platered by a mason for exterior

1369


Define What is the origin of name Railway Sleepers?

818


How will you Engage Labours on Site?

1410