Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why we are maintain phase to phase clearence

Answer Posted / k s patil

prevention of carrona effect between two phases & short ckt.

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Dear Respected sir how to test ABB REX521 protection relay by relay tester.

2792


Why is negative feedback invariably preferred in closed loop system?

2374


A parallel flow heat exchanger will perform better than a counter flow heat exchanger. State if the statement is true or false.

1318


Briefing the effects of ASR and ACR of a double closed-loop speed regulating system.

2283


What is mean by spike arrester(Voltage Operated)

2108


What is tranformer differtial?

2090


As you achieve greater success with the company after some years, Will you like to be a share holder in our company?

2866


whate is the meaning of balance/unbalance,in stabilizers type

2186


The Howland current source produces a A Unidirectional floating load current B Bidirectional single-ended load current C Unidirectional single-ended load current D Bidirectional floating load current

2124


define superposition theorem thevnin theorem ,norton theorom?

2455


Role of active and reactive Power sharing in between two synchronized Generators, Droop Setting role ?

1811


which network topology offers the greatest level of tolerance?

2223


We have 5 Distribution sections with variable loads&We have 3 Gensets(500kva,380kva&250kva) our total load is between 400kva to 600kva. so how could we connect 3gensets.

1909


what is RNG in the DG synchronizing by PLC?

2173


How PSV sizing being done

2367