To measure insulation resistance of 11KV cable between core
& armour, what should be the test voltage & duration?
Answer Posted / v.senthilkumar
To measure insulation resistance of 11KV cable between core
& armour, we can use 5kv megger for 60 Sec.
| Is This Answer Correct ? | 22 Yes | 2 No |
Post New Answer View All Answers
1.what is mean by 8/20 micro sec waveshape
is ac supply can store
in parallel operation of power transformer why the distance between power transformer and capacitor bank feeder is necessary to know
How to do fabrication , busbar and wiring cost for : 1. LT Panels 2. C& R Panel
What is boucholz relay and the significance of it in to the trformer?
how to design the heater in temperature control unit to heat 50KL of water?
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
why not starting switch first connect in direct on line starter?????
Do Phase angle measurement have any application in freq/harmonics measurement? If so how?
How CFL &T5 tube light glows?
armature is that part in which current is induced since in dc motor we supply current to the conductor so why we call it armature?
if any house we instaled a 1.5 ton ac and its phase cable of wiring is installed but netrual cable of wiring not instaed. my question is that is neutual of house(for other wiring is capable for ac load or a sepeart neutrual wiring required
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
What will be advantage if we put some load in neutral of grounded star transformer & loadshortcircuit current,rated current of cable & MCB with example?
why fractional pitch winding generally used in alternators?