Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the function of open delta System?

Answer Posted / hihi

open delta system or the v-v connection is used to minimise costs as it is a bank of 2 1-phase transformers can b used for the power supply purpose ..but its poweer output is 57% of the 3 ph transformer .. used wen less load cond so d losses r less ...and wen in fftute load requiremnt increases the 3rd windin is added

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

is the value of inductance depends upon the value of thitha in doubly excited machine??

1976


I want single line diagram for AMF & DG syncronizing panel

7116


while doing high voltage test on 11kv/433 distribution transformer why we only give 28 kv on hv side and 3kv on lv side for power transformers what is the value what factors it depends

2802


Advantages of using generator circuit breaker (GCB) scheme in a power station ?

5215


What is rotating magnetic field?Discuss elaborately.

2589


Give idea about General Engineering. From which book i can study this topic. Pl. reply me via email. My email is ravi@bhelhwr.co.in, also give the name of book/website, from where i can prepare it.

2002


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2769


i need about 10 years of GATE solved papers in pdf format and even mock tests toooo

1620


What is lifting power for 1 wb/m2 and 1 A magnet?

2140


Define open loop control system.

1057


i am gng to visa interview this july i have 4 backlogs gre 1010,toefl 75,pls give me the tips pls pls

2099


Would you recommend to replace all oil filled cables with xlpe cable for hv transmission with the current technolgy for xlpe cable?

1434


what is p.s impedance measurement test in earthing transformer?

2344


how to calculation increase power factor for single phase

2253


What is negative sequence over voltage element?

1897