hi,
how would i run job1 then job 3 , then job2 in a sequence of
job1 ,job2,job3.

Thanks
sunitha

Answer Posted / kiran

hai sunitha..,
How ru?

by using Nested activity in job sequenser.its for sheduling
purppose in job sequencer.

Is This Answer Correct ?    4 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Differentiate between data file and descriptor file?

615


How will you load you daily/monthly jobs datas in to Fact and Dimension table using datastage.

2987


1)How will u implement SCD2 by using surrogate key. 2)What are the disadvantages with surrogate key. 3)How will you handle nulls in your project for the varchar, integer data types. 4)Can I use two fact tables in star schema. 5)3 jobs are running on the 2 nodes after I added one more node so can I compile those jobs to run on three nodes.

3501


What are the primary usages of datastage tool?

623


What a datastage macro?

632






How will you move hashed file from one location to another location?

1653


What is "fatal error/rdbms code 3996" error?

663


A signal has a wavelength of 1 micro min in air.how far can the front of the wave travel during 1000periods?

2027


If you want to use the same piece of code in different jobs, how will you achieve it?

632


how to add a new records into source?

1525


how can we validate the flat files using the date in the header and number of records in the flat file? Using both conditions at a time.

2726


Describe routines in datastage? Enlist various types of routines.

579


if we using two sources having same meta data and how to check the data in two sources is same or not? and if the data is not same i want to abort the job ?how we can do this?

1755


What all the types of jobs you developed?

663


Hi All , in PX Job I have passed 4 Parameters and when i run the same job in sequence i dont want to use those parameters , is this possible if yes then how

1118