hi,
how would i run job1 then job 3 , then job2 in a sequence of
job1 ,job2,job3.
Thanks
sunitha
Answer Posted / kiran
hai sunitha..,
How ru?
by using Nested activity in job sequenser.its for sheduling
purppose in job sequencer.
Is This Answer Correct ? | 4 Yes | 8 No |
Post New Answer View All Answers
Differentiate between data file and descriptor file?
How will you load you daily/monthly jobs datas in to Fact and Dimension table using datastage.
1)How will u implement SCD2 by using surrogate key. 2)What are the disadvantages with surrogate key. 3)How will you handle nulls in your project for the varchar, integer data types. 4)Can I use two fact tables in star schema. 5)3 jobs are running on the 2 nodes after I added one more node so can I compile those jobs to run on three nodes.
What are the primary usages of datastage tool?
What a datastage macro?
How will you move hashed file from one location to another location?
What is "fatal error/rdbms code 3996" error?
A signal has a wavelength of 1 micro min in air.how far can the front of the wave travel during 1000periods?
If you want to use the same piece of code in different jobs, how will you achieve it?
how to add a new records into source?
how can we validate the flat files using the date in the header and number of records in the flat file? Using both conditions at a time.
Describe routines in datastage? Enlist various types of routines.
if we using two sources having same meta data and how to check the data in two sources is same or not? and if the data is not same i want to abort the job ?how we can do this?
What all the types of jobs you developed?
Hi All , in PX Job I have passed 4 Parameters and when i run the same job in sequence i dont want to use those parameters , is this possible if yes then how