hi,
how would i run job1 then job 3 , then job2 in a sequence of
job1 ,job2,job3.
Thanks
sunitha
Answer Posted / kiran
hai sunitha..,
How ru?
by using Nested activity in job sequenser.its for sheduling
purppose in job sequencer.
| Is This Answer Correct ? | 4 Yes | 8 No |
Post New Answer View All Answers
i WANTED TO USE THE RANGE LOOKUP SCENARIO IN DATASTAGE 7.5.2 SRVER JOB.i HAVE A DATE FIELD IN SOURCE AND I SHOULD MATCH IT WITH A FIELD IN LOOKUP FILE.BUT,THE FIELDS SHOULD MATCH EVEN THOUGH THERE IS SOME RANGE.CAN SOMEONE TELL ME HOW CAN I DO THAT. THANKS
What is usage analysis in datastage?
Can you explain tagbatch restructure operator?
Difference between server jobs & parallel jobs?
Differentiate between datastage and datastage tx?
What is difference between server jobs & parallel jobs?
WAT TYPE OF PL/SQL QUERRYS USED IN DATASTAGE
What is the difference between in process and inter process?
How you can fix the truncated data error in datastage?
What are the stages in datastage?
How to convert RGB Value to Hexadecimal values in datastage?
What is ds designer?
What all are the different way to run a job?
What are the types of containers and how to create them?
What is datastage?