while extending the material master view after saving error
is coming that the field material number is defined as a
required field,it doesnt contain an entry. After selecting
that it is showing the particular material may be locked.
Pls do the needful.
Answer Posted / razesh
It means either you/somebody are viewing the material in
seperately with mm02 tcode.So it says locked by user XXXX,
and you can know the user also.ask him to exit and try to
save it.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the SPRO Path for requirement class and req. type?
What are dynamic actions? Give a few examples. What are it’s you used in them?
What are the reports generated in product cost controlling information system?
What are basic dates?
Can we create production order without bom and routing ?
Define standard cost
Explain Flexible planning Procedure?
suppose we have sales order-40, PIR-25,warehouse stock-40, so when we run mrp,what quantity the system displays with MTO & MTS. How?
What is phantom item & sub contracting
How to move to the realization phase?
Explain what is the need of mrp list if the stock requirement list is already given?
What is the transaction code to run MRP for sales order?
Explain source inspection.
What is the difference between indian and us payroll?
what are Standard keys