we are using three transformer 33000/430 vac for three
separet block.all three transformer have three LT panel
separetly. can be Interconnected all three panel through bus
coupler. this is permissable or not by state electricity board.
Answer Posted / manoj dubey
apart from above said pl. also check for your switchgear
rating for fault current as you parallel the system your
system fault current level will increase so your system
should be able to take care of it.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the range of the stator resistance of 3 phase induction motor?
what is the most permissible winding temp when we conducting a generator load test?(condition no load)
How we select the vector group of 3phase power transformer?
Why synchorised generators are used for the production of electricity?
What is the comparison between 30mA DP RCCB and 100mA DP RCCB and can replace it against 63A MCB
why we use Test Terminal Block in 11 KV and 33 KV electrical panels.
please write motor, transformer, Generator setting, fault level calculation of Tr.etc
how can you calculate fault level ?
Why we are going for converter transformers for DC drives application instead of distribution transformer?
The screw thread commonly used for transmission of motion is one of the following types of threads
please explain to me how to calculate current,voltage,resistance with formula??
Z transform is use when system is not a) converges b) diverges
How to test the vector group of a Yd11 transformer? what are the relations to be checked between various vectors to confirm this vector group?
why the India electrical supply transmission loss is high when compare to us
I want definition for ABT Meter (Availability Based tariff) ?