Answer Posted / sachin
if wt of steel is to calcullated then
steel=(d*d)/162
if area of steel is to be calcullated then
Ast=((0.5fck*b*d)/fy)*((((4.6Mu*10^6)/fck*b*d*d)))
| Is This Answer Correct ? | 15 Yes | 5 No |
Post New Answer View All Answers
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
what is SDLC ?and write a 'c'program for to swapping the three numbers?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
What are the phases inspections are done by local authority while construction?
What is meant by Crystal Concrete?
Why should pumping be not used in case of concreting works?
What does civil status mean?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
Who designed the city of washington dc?
How to calculate plastering for elevated water storage tank
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
RR masonry rate analysis
How to determine spacing of bars in slabs or beams