Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

when the operation engineer told you that he gives the
control valve order to open but there is no response !
what will you do ?
and if you found that there is astuck , what will you do ?
(note : it is apanumatic valve )

Answer Posted / chitturi bhaskara rao

1.First measure 4-20mA in field side if cannot get 4-20
then check AO card , if u got 4-20 in field side then check
positioner ,
2. make sure thatt sufficent air supply i,e 3 to 4 bar at
inlet of positinoer.
3.If all correct still valve nvr moves then remove
positionner from the valve and supply the air directly to
actuator ( to 4 bar max) then valve moves smoothly then
check angle of postioner while ur fixing positoner on
control valve .
4 if valve nvr moves smoothly means in side valve jam need
to send over haul

Is This Answer Correct ?    20 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to commission furnace ( water heater)

2049


what about your moleg in pogrees with company

2279


what is the calibration procedure for transweigh make weigh feeder?

4024


what happen if i increase height of displacer type LT.accuracy or sensitivity are affected.why?

2483


how u choose thermowell lenght n pnumatic C/v size?

2113


Explain the working of an enraf level gauge.

1101


what is exact time to study dcs and plc cources

2050


What is instrumentation technologists and mechanics?

976


find the kp ki kd from the transper function G(S)=29.44s+04707/1.5349s2+s

1938


line up procedure for dp type flow transmitter?

1902


can you provide me full detail about instrumentation in ONGC??

2168


how to calibrate steam control valve in steam turbine

3331


what is cems analyzer explain with principle and drawing ?

2384


how many type of plug are used in pneumatic control valve,name them.

5447


Explain the working of rota meter.

1222