how can i restrict no of items in sales order? ex:sales
order has been created for 10 items and all the 10 items
quantity should be 72 not more than that and system should
not allow to enter the quantity.where we can configure for
this.
Answer Posted / ganesh
In my point of view at the time of creation of material
maseter we need select the MRP1 MRP2 MRP3 in MRP1 once we
mentioned PD instead of ND next comes MRP2 we can mention
the minimum ,maximum order quantity thatis the one way.
If i am wrong please correct me and send to
pkgnaidu@gmail.com
| Is This Answer Correct ? | 3 Yes | 6 No |
Post New Answer View All Answers
IF u have worked on EDI IDOC, while sending PO to vendor how u connect to the system. Tellme the entire design and steps of the screen. how it looks.When i told we need to create port, partner profile, outbound idoc process. Interviewer not satisfied.
A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration?.
What are the configurations steps for packing?
explain requirement class and requiremnt type in detail with business examples
Can anyone tell me please how is the availability check carried out, how is availability working out in your job business, how is the ATP (availability to promise) is configured?
Do you know what’s availability check is?
What is the difference between sd account key and fi account key?
What are the responsibilities of "core team" and "functional team" in an implementation?
Do you know what is made to order scenario or make-to-stock scenario? SO, in the make-to-order scenario, what’s the integration touchpoint that you figure MRP? My question is when you have a make-to-order scenario, how does MRP will be figured? How system know that when you create a sale order whether the sale order is calling for make to order or make to the stock type of order, which data determined this is made to order make to stock…. The system should understand when I create an order, whether it’s made to order or make to stock, so which parameter which value that system will be determined based on that system will say okay this make to order so I need to I mean the system has to go to the next level then it’s going to the MRP all the subsequent planning will be taken taking place, what’s the parameter that we have to check?
What is item category? How can we assign it?
Have you know the shipment and shipment cost
What is document type?
In third party order processing what are the standard G/L A/c's to be posted in ME21?
How do you determine the 'route' in sales and distribution?
How is the shipping point determined?