Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

if we supply to secondary winding how transformer work?

Answer Posted / ranvir

There is not structural difference in between primary and
secondary winding.Bothe winding can be used to give
input.If your transformer ratio os 1:2 , if you used
opposite it will be work as a 2:1 transformer.

Is This Answer Correct ?    7 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is mean by transition resistance of transformer?

4482


what should be correct gas pressures to be a 1.5 ac unite

1432


what is the principle of operation of CFL ??

2606


is IS says that neutral should be brought to switch box. and this one is a recomended practice

1812


What is slope...? Explain slope 1 and slope 2...?

1543


How test for Ddo vector group test condition?

2398


Why 1/3 is used in symmetrical components?

1777


how power trnafor from 1 point to another point in bus bar ya transmission line( voltage trnasfer from 1 point to another poin)

1911


can anyone provide me a amf panel control wiring using ec-2 relay?

2199


What is the transfer function?

1041


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1988


A mass of 1200g is accelerated at 200 cm/s2by a force. The value of the force required is:(a) 2.4N(b) 2400N(c) 240 kN(d) 0.24N

2888


we can run 2phase as 3phase .what will be the differnce with respect to phase angle, power, current between the two modes

2097


What is steady state response?

1251


Disadventage of cable-gland earthing if any ?

2157