Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How can we calculate the rating of capacitor bank to be
connected for a particular load(ex.100kw)to improve the
power factor from 0.8 to 0.9?

Answer Posted / pasuvaraj

Mr Ravikumar, When your calculating the KVAr, you using the
KW in the Formula, How you consider the KW, The KW after
the KVAR Added or Before Added. This my doubt in your
formula you have explained

Is This Answer Correct ?    3 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.

1088


hi friends this is a newcomer in your community of enthusiastic peoples. i am preparing for SSC (CPWD JUNIOE ENGG EXAM FOR ELECTRICAL) pls guide me on the same how to crack it? PLS LET ME KNOW IS ANYONE THERE WHO PASED IT? CAN I GET THE QUESTION PAPERS OF PREVIOUS EXAMINATIONS?

2225


if we look on phasor of the transformer vaoltage is 180 oppsite at primary and the secondary so to improve a power factor is secondary should kept negative to improve it primary side means is -.90 became +.90 at other side

1848


what does a k rating in a transformer means?

2478


What are the difference between CT/PT operated Meter and RRAMR Meter for HT/LT application?

2587


How to Make relay co ordination chart for a Electrical power distribution of a plant

3821


Why collecting electrode of ESP to be earthed

2117


state the disadvantages of carbon filament???

2914


for what voltage will reactive power be largest in 380 kv line : a) 375kv b)380kv c)385kv

1466


how to select overload-relay for perticular motor 1.for D.O.L. starter 2. for Star-delta starter ????

2816


what happen if field of dc shunt motor opens? what is function of putting res. in parallel to one phase of 3 phase IM? the power supplied by 5A source in circuit is given by------Watt.

2040


What is deference between MCB & MCCB & ISOLATOR

2096


What is an iron loss or core loss pi?

1087


What is the simplest formula to calculate the rotor diameter of a synchronous generator?

2433


What are the basic & Majour problems in UPS ?

2109