WHY DO WE PROVIDE DEVELOPEMENT LENGTH AND EXTRA BARS AT TOP
Answer Posted / muqdad jawad jafar
negative moment normally require providing extra additional
bar at the top of horizontal concrete casted members that
often positioned within the area supported by column/wall.
the top extra length should exceed the inflection point
between negative and posetive moment.
| Is This Answer Correct ? | 36 Yes | 3 No |
Post New Answer View All Answers
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
How to calculate the force on a column of three story building. What should be the base concrete height?.
What is the likely strength of a 1:2:4 concrete mix?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
Formula for calculation volume of essentric footing
2nd and 4rt angle elevation used in which country ?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
residential buildings,mixing of concrete,structural,construction material,site handling.
what is civil all interview questions
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
What is aggregate?
Explain what is alternate bid?