Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is mix design

Answer Posted / mohammed essam

as per the design, a load is given and the strength of concrete is being provided to the ready mix company, for ex M800, It implies that the structure requires a concrete capable of taking load upto 800N/mm2, the ready mix company mix ADMIXTURES such as fly ash, rise husk etc. its known as the design mix

Is This Answer Correct ?    1 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?

1398


How to calculate chejja reinforcement

2614


Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.

2312


how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......

1937


Explain what are the skills required to become an architect?

1223


What are the methods of measurement? Describe it shortly

2287


What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.

2034


HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL

1500


How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????

2107


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2140


What is the difference between EPC,DBOOT and BOOT.

25048


Which code is used for tor & tmt steel bar?

1244


for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area

2395


Howmuch bend to be provide for 200/600 BEEM

1666


How to make a c++ program that converts any base to base 10?

2105