Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to Calibrate Penumatic Transmitter.LRV= -60 URV= -20.Can
u give me Answer.

Answer Posted / venkat

actually we can calibrate LP side by positive pressure and
Hp side also we can calibrate by negative pressure but LP
side better

Is This Answer Correct ?    3 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the charcterstics of a P&ID controller block for Governor speed raise or lower for a load sharing functionality between 4 Gas turbines in droop mode.

2966


POSSITIVE PULSE IS APPLIED TO AN INVERTER INPUT.THE TIME FROM THE LEADING EDGE OF THE INPUT TO THE LEADING EDGE OF THE OUTPUT IS 10 ns. THE TIME FROM THE TRAILING EDGE OF THE INPUT TO THE TRYLING EDGE OF THE OUTPUT IS 8 ns. WHAT ARE THE VALUES OF tPLH and tPHL?

2226


A DP transmitter is used to measure the level of an open tank. The drain line of the tank is connected to a control valve, and is configured as, if the level of the tank is 90% the valve should get open 10%. And if the tank level is 10%, the valve should get open 90%. Draw wiring diagram and explain how to configure DP transmitter and control valve using HART communicator. If the span error at output is 1%, what will be the %opening of the control valve at 60% level of the tank?

1337


control panel design guidelines

3325


How vortex sensor used for steam flow measurment can be checked on line i.e without taking out from process line.

2084


Why do you want to work here

2263


whats the abbreviation of IOP? is it instrument of power or input open problem?

1094


for oil & gas industries which zone is normally preferred? why? give its example?

1936


Can combine control system for Emergency control system (ESD)and Fire & Gas System ( F & G) is possble to built and offer to client? Can such system is as per Norms in India?

1934


who's take first position in process in the timing of new installation flow transmitter and control vavle. give the answer with logical trick.

5072


What is standard procedure of manual mapping in Radar type level transmitter?

1882


Can anyone send most commonley asked Instrumentation questions and answers in cement industry please?

1939


principle of dead weight tester ?

2002


what is the reset offset and control system in instrumentation

3553


what is actual drum level and compensated drum level?

2175