in our sub station why we step down firstly 33kv\11kv then
11kv to 430v. can we direct step down 33v to 430.v.
Answer Posted / devesh mishra
yes we can directly step down from 33/.433kv.
the lv side remains constant for 11 or 33kv & hv side
depends on load i.e,
for load upto 1.5 mva 11kv ht line is required,whereas
for load above 1.5 mva 33kv ht line is required
Is This Answer Correct ? | 3 Yes | 12 No |
Post New Answer View All Answers
(1)Can earth and be conected together (2) what is the diferent between earth & neutral
what is ramping rate of generator
What is the physical significant of power factor?
Hi.. I am a BE GRaduate in E&E. I have 8.5 Experience in Tendering & Estimation field. I have done SAP SD course few years back. But due to some reason i failed to get job in that field and continued my own field. Now I am thinking of changing into SAP seriously. How should i go ahead???
Is it possible to obtain 480v or 550v in single phase output by giving the input to 230v to a single phase torodial type transformer without using a stepup transformer?
How we calculate the current carrying capacity of H.T. cabel?
how a flip flop can be used as a latch?
why power factor is important?
How To increase Knowledge Of boliler regarding To Only Electrical Field..
if i get a drop in my 1st year and the i clear my 2nd year and 3rd year all clear and i dont have any back logs so can i be able to sit in campus selection??
What are the material used for resistor?
How relay coordination has to be done? what are the inputs are required for this? Please explain this with calculation method?
what is the power rating of CPU, CRT type moniter, LCD type moniter,scanner Approx.
in my industry we are using 3 step up transformers for induction heaters..i.e 415/580v and other are 11/440v.in power consumption does a step trnsformer makes any difference compared to step up?? plz explain
determine two methods to find loose connection in operational electrical system?