Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

in our sub station why we step down firstly 33kv\11kv then
11kv to 430v. can we direct step down 33v to 430.v.

Answer Posted / anas

cuz u have to pass it first on substation (distribution
boards) to make it easier cut and start the current in case
of any fault happened and if u didnt do that damage we will
be easy not just easy very very very easy and cause the
transmission stations to damage and u will loss power when
u transform from 33kv to 430v directly ahuge amount of
current will be in the cable that means very huge cable
besides loads alaways
unbalanced..................................................
..................

Is This Answer Correct ?    4 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the applications of different multistage amplifiers?Plz also write advantages of these amplifiers? Thaaaaaaaaanx

2964


What is the name of the winding from which the supply is taken for load connections?

1127


300m long and 30kw inductive loade 3phase supply how many size cable required

1486


How to measure power in 2 or 4 or n phase circuit? Please give me a formula.

1960


WHAT IS THE PARTIAL DISCHARGE TEST?

2175


Can anyone provide with a SLD for HT panel installation for a 33KV line and distribution end has three 1.5MV transformers. Is it suitable to use OCB or VCB and also provide me the suitable rating and its connection diagram.

3407


is it possible to start a motor in felid connected to a remote mcc

1979


What are merits & De-merits of State-Space Method? What is series programming, parallel programming, general programming & direct programming ? And, difference between these programmings Techniques ?

2467


I am shobana from Chennai. I am having my personal interview on 19th Dec at Chennai.kindly mail me the questions to mail id shobana.shanthi@gmail.com

2426


When we connect the large capacitor bank in series ?

1148


What is the difference between resistance grounding system and resistance earthing system?

1163


As an electrical engineer what are the responsibilities which i can hold in TCS?

2271


DEAR SIR,I GOT THE CALL LETTER FROM RRB, SECUNDERABD AS A JE-II SO PLEASE PROVIDE ME SOME MODEL QUESTION AND ANSWER PAPERS AND LAST YEAR QUESTION PAPERS

2087


After taking shutdown of 11kv feeder, if you see 5kv by phasing stick in the cable side, is it possible to close earth switch in cable.

2408


Please tell me the earthing procedures adopted for the STAR-STAR 3 Phase transformer in india and give a better sugession for earthing

2021