Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How many number of bricks required for 1 cum & how much mortar
quantity require for 1 cum

Answer Posted / naresh thakur

500 no. of bricks(brick size - 20cm.*10cm.*10cm.) required
for 1 cum of brick masonry.

and suppose, ratio = 1:6
then , sum = 1+6 = 7
as we know, total dry mortar required for 1 cum. of brick
masonry = 0.30 cum.

therefore following dry matrial required.

cement = 1* 0.30/7 = .04 cum. *28.8 = 1.15 bags.

sand = 6* 0.30/7 = 0.26 cum.
or 0.26 cum. * 35.3 = 9.18 cft.


Material required for 1 cum. of brick masonry in mortar
ratio of 1:6.

cement = 1.15 bags.
sand = 9.18 cft.
bricks = 500 nos.

Is This Answer Correct ?    316 Yes 54 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

pls tell me , what is the water content

2153


what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????

1884


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1755


how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...

2321


why top layer of block work shoud be full size if any cut block adjustable than another layer?

2135


1:4:8 pcc calculation 591 cu.ft

2241


I have an span length 16 ft c/c

1416


how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.

2575


Which is the best book for building construction?

1063


How to calculate quanty of steel in four leg stirrups?

1877


who to find building iron rod strenth

2108


What is the name of this multiplication factors ?

2091


What is the largest concrete dam in the world?

1124


What are the basic use of runners and standards of pipelines?

1167


how to prepare site mix design

1914