why we use minimum cement as given in IS mix design code
Answer Posted / guest
For economical results & to save nations natural asset.
| Is This Answer Correct ? | 2 Yes | 9 No |
Post New Answer View All Answers
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
What is critical path method (c.p.m)?
The 4 main factors to start a construction project are––
Explain what are the phases inspections are done by local authority while construction?
Slump Values for works?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
how to calculate freeboard in under ground water tank and technical details
what is diversion?
what is pile and deam foundation
What is the use of extruded feature in solidsworks?
Define What is diversion tunnel in a dam?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?