What are stage in a Bug Life Cycle?

Answer Posted / mahi

NEW- Whenever the defect is newly identified for the first
time then the testengineer will set the status as new.

OPEN-Whenever the developer accepts the defect then he will
set the status as open.

FIXED- whenever the developer rectifies the defect before
releasing the next build he will set the status fixed.

CLOSED-Whenever the next build is released the testers will
check whether the defects are properly rectified or not.if at all they feel defect is properly rectified then
they set status as close.

REOPEN- once the next build is released the testers will
check whether the defect is properly rectified or
not.if at all they feel derct is not rectified
properly then they will set status as reopen.

HOLD- Whenever the developer is confused to accept or reject
the defect then he will set the status as hold.

REJECT- whenever the developer feels it is not at all a
defect then he will set status as reject.

ASPERDESIGN- Whenever the developer feels the tester has
raised the defect without knowing the latest
requirements then he will set the status as
asperdesing.

DEFFERED- Whenever the defect is accepted by the developer
and he requires some extra time to rectify that
defect then he will set the status as deffered.

pls let me know any thing wrong.

Thanks & Regards
mahi.kotike@gmail.com

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

in an online banking software,users are connecting to bankserver by login.This login module can take below inputs for user. a/c number prefix-3 digits but doesnot start with 0&1 a/c number sufix-6 digits number password-5to 10 chars alphanumerics in lowercase areacode-3 digits number but optional purpose- cheque deposit money trasfer mini statement bills pay After filling above fields,user can click submit button to connect to bank server.prepare test scenarios for online banking s/w login.

1518


please give information about ERP Projects and how V-model use in project

2371


During alpha testing why customer people are invited?

712


how to clarify functional requirements and non functional requirements in a srs?

1569


Can some one help me writing a manual test case for email applications like yahoo i need for www.everonn.com

1526






Describe a past experience with implementing a test harness in the development of software.

3167


please anyone let me know the -ve testing of Excel sheet?

8612


What do you plan to become after say 2-5yrs (Ex: QA Manager, Why?)

1654


*) Internal review defect gets detected… 1) During peer review. 2) By the own stuff member onsite/offshore. 3) During Informal review process. 4) None of these 5) All of these

1841


What are similarities of Agile and Scrum?

2461


Explain the difference between alpha testing and beta testing.

645


What are the benefits of creating multiple actions within any virtual user script?

1713


What are different types of verifications?

699


What is unit level testing?

644


What are the main key components in Web applications and Client Server applications? and their differences?

1487