Answer Posted / sundhu
Use of Pegged Requiremets:
You can use the Pegged requirements function to retrace
from any BOM level
1) which requirements are the source of which procurement
proposals
2) which independent requirements (especially sales orders)
are affected if a procurement proposal is cancelled or a
date or quantity is changed on a lower level.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
What is the use of t-code cs20 in bom?
Explain variant configuration
What is Material status and which view of the material master it is available?
What are the reports generated in product cost controlling information system?
In lsmw which is the most important step?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Explain how the pp module is organized in sap?
What is the t-code for changing production order and to display production order?
How to group employees for their allowances in payroll?
How to create object dependencies in a bom for a configurable material?
What is the difference between the fixing type 1, 2, 3, 4?
What is the planning horizon?
What are sequence, parallel, overlapping, splitting and where can we assign these
Explain the uses of the simple maintenance interface?
Are there any reports in sap to list of material requirement from ltp ?