can any one tell me what is the difference between MRP and
MPS?
Answer Posted / sundhu
1) MPS is maily focused for critical or Top level items
(single level of BOM), where MRP is used for bottom level
(All level of BOM's- Like single item Multilevel, Single
item Single Level)items.
2)Compare with MRP, MPS is a long term Planning.
3) Example for MPS is Television Manufacturig Industries,
Example for MRP is Garment Manufacturing, Sugar Industries.
Note:
For both we need to maintain the safety stock.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What are the MRP master data?
What are the key fields in MRP views?
What is a 'product hierarchy'?
What is the role of an administrator in pa?
What is mrp controller means?
What is planning horizon?
Tell some standard order types and what configure done for current project
Mention what are the t-codes for creating, changing and summarizing bom?
In the monthly lot size proc, how to generate lot at the end of Period?
What is standard order type
How to delete a group of products that was created in screen mc84 ?
What is a ‘routing’ in pp?
What is plm (product lifecycle management) in sap pp?
What is a ‘work center’ in pp?
SPRO path for order, confirmation or requirement class.