can any one tell me what is the difference between MRP and
MPS?
Answer Posted / sundhu
1) MPS is maily focused for critical or Top level items
(single level of BOM), where MRP is used for bottom level
(All level of BOM's- Like single item Multilevel, Single
item Single Level)items.
2)Compare with MRP, MPS is a long term Planning.
3) Example for MPS is Television Manufacturig Industries,
Example for MRP is Garment Manufacturing, Sugar Industries.
Note:
For both we need to maintain the safety stock.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
how many times pcc can run for one material?
What is the production process in sap?
We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
What is costing? How it is affected the pp?
Explain customer Independent requirement .
What is the standard info set?
What do you do to run MRP for just one MRP Controller?
Explain about rough cut planning
How do you integrate HR (employee) with PP?
Explain what is plm (product lifecycle management) in sap pp and what is the use?
What is scope of planning?
What is known as 'demand management'?
What is time phased Planning?