in our sub station why we step down firstly 33kv\11kv then
11kv to 430v. can we direct step down 33v to 430.v.

Answer Posted / devesh mishra

yes we can directly step down from 33/.433kv.
the lv side remains constant for 11 or 33kv & hv side
depends on load i.e,

for load upto 4 mva 11kv ht line is required,whereas
for load above 4 mva 33kv ht line is required.

Is This Answer Correct ?    40 Yes 25 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Load break swicth maintenance procedure.

1318


Dear sir, I have completed DECE in the year 1995. I have work experience in HT and LT LINE more than five years. Now i am doing BE in EEE from rajasthan university. After completion of BE,can i apply "C" Licence sir? Please reply.

1494


What are the basic elements used for modeling mechanical translational system?

608


What is the formula for calculating impedance of transformers connected parallel at fault level 50KA?

1596


What difference between ref protection and differential protection ?

1329






If VFD is On but no starting commond on it. so how many outpout voltages of VFD

684


What's the difference between non break power supply and non break non short break power supply

1024


why is the power generator connected as star earthed or star earthed through reactance and what its features ?

1166


HOW TO TEST A LIGHTENING ARREST ER ?

1706


can indirect loading be called as phantom loading?

1557


Hello Friends, How can we recognize the CT Star Point is S1 or S2 in case of Electro Mechanical Relays and what is meant by Restraining coil in relays and what is the purpose of that.. thank you in advance..

1675


circuit diagram of trip circuit supervision relay

1593


Define ohm’s law for a.c (alternating current)?

626


what are the Alarm, Trip & Safety equipment (Issues) present in Power Transformers pls Mail it to ashokbabunhce@gmail.com

1451


What are test values for an 63 KVA and 100 Kva Distribution Transformers for the following typical tests 1)Magnetic balance 2)Short circuit test 3)Open Circuit test 4)Vector group confirmation test .please give me the standard values for all the above tests.

2262