As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / saravanan
If the specififcations not satisfied, to dismantled the
poor quality areas and the repair work has been done for
that area which will be appropriate for the construction.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is made from large rocks, which protects the base of cliffs?
pls give me ans to ACT formula cube testing porpuse
how can calculate cutting length of diamond ring
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
what is mean by c32/40s concrete class
Why you are leaving present job?
Define What is made from large rocks, which protects the base of cliffs?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
pls mail some more tecnical qustions at msaranya2610@gmail.com
silt%= silt volume/ silt+sand volume is this right?
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches