As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?

Answer Posted / saravanan

If the specififcations not satisfied, to dismantled the
poor quality areas and the repair work has been done for
that area which will be appropriate for the construction.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is column foundation

1817


I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??

1317


resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil

2177


what are the layers of the national and heir aprox thickness??

1579


What is the difference between shear and tensile strength?

644






how much tempareture are required to make liquid state of pid leed

1694


How is the leaning tower of pisa supported?

630


how will remove spiderweb cracking in plaster ? what the reasone of make it ?

1491


Why should pumping be not used in case of concreting works?

972


what is anchorage length,lap length and (dont remember the last one)

1721


What is missing report and how to prepare

1013


What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.

1836


How do you determine specific gravity of cement?

686


Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam

5115


How to cal. The weight of hollow pipe?

709