As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / saravanan
If the specififcations not satisfied, to dismantled the
poor quality areas and the repair work has been done for
that area which will be appropriate for the construction.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Describe Briefly The Various Methods Of Concrete Curing?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
What is diversion tunnel in a dam?
what is diversion?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is Short bored pile foundation.
What is the standard volume of pharma in cub ft
What are the uses of layer?
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
how to calculate the steel in 500yard
What are the ingredients of pre-stressed concrete?
rate analysis hiring of generator 62.5 KVA
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
What is braced excavation all about?
what is differences between ferrock and concrete ?