What are the dimensions of
1)Standard Brick
2)Nominal Brick
What is the difference between them in terms of use ?
Answer Posted / rashmi
Standard size of brick is 19cm*9cm*9cm
Nominal size of brick is 20cm*10cm*10cm
| Is This Answer Correct ? | 128 Yes | 27 No |
Post New Answer View All Answers
in design case of structural member best suitrable percentage of steel limit is what
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
How to compute minimum number of columns required for a site from area of site?
What is the Maximum %age of Steel in columns and beams ?
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
satart to end steps by step process of building construction...? i want to planning theme accuretly
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
What is the Unit weight of coarse sand (F.M- 2.20) ?????
what is the tensile strength of 10swg and 8swg gabion wire?
In jack arch floor, the rise is kept?
For fine aggregate which is most suitable River sand or crusher sand & why ?
Which brick is best for construction ,either fly ash or AAC BLOCKS
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?