I need the proper answer on :-
What is the Earthing Value as per the standard for Raw
power and UPS Pit and in panel /DB N-E value ???
Answer Posted / k.p.sharma
The Earthing Value as per the standard for Raw
power and UPS Pit SHOULD BE LESS THAN 2 OHM and in
panel /DB N-E value SHOULD NOT BE MORE THAN 5 VOLT.
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
rajha power sector details
Batteries used for electrical energy storage are a. Laclanche cells b. Edison cells c. Lead acid cells d.any of the above
What is the application of Dyn1 and Dyn11 vector group of transformer?
1- XC and the RC time constant are both measures of the reaction of C to a change in ____? 2-The power factor is a numerical ratio with a value between 0 and 1 equal to the ______________ of the phase angle. 3-When V and I are out of phase because of reactance, the product of V times I is called ______________ power 4-For _____________ inductors, the branch currents can be added algebraically. 5- The ______________ power in watts can be calculated as I^2R 6-Calculate XL with L = 30mH and f = 1kHz ( I have Xl=2piFL 2*3.141592653*1kHz*30mH =188 ohms Please check) 7-A parallel RL circuit has the values, R = 5kohms, XL = 5kohms. A voltage source of Vt = 10Vrms is connected in parallel to R and L. Determine the total current, It delivered by the voltage source Vt. 8-A series RC circuit has R = 1Mohm and C = 1microF. How long would it take for the capacitor to fully discharge if it is initially fully charged? 9-A circuit has real power = 300W and an apparent power of 500VA. Determine the power factor and phase angle. 10-The time constant for an LR series circuit is T = 0.1s and R = 10ohms. Calculate the inductance L.
Mention the methods for starting an induction motor?
Why the standard of ambient teperature mentioned as 40 degree celcius in machines.
How to calculate flow of water delivered by pump when pressure & size of pipe line is given
can u please mail me the syllabus for GET exam for damodar valley corporation?
What is mean by spike arrester(Voltage Operated)
how can we change the polarity of Alternating current rapidly? how frequency of ac can be controlled and changed easily?
am commissioning the trafo without connecting the neutral therefore unbalance will occur what is the alternative solution for this?
What are the effects of adding a zero to a system?
what is mean by parallel operation of permanent magnet generators
what is the minimum recommended leakage current of an earthed cable connected to the body or skid of an alternator
what are the differant std sizes of cable trenches?